case studies

Emergency VFD Fix for United Airlines

Emergency VFD Fix for United Airlines

United Airlines had an SRS (Storage Retrieval System) line break down in its San Francisco Terminal due to an obsolete VFD (Variable Frequency Drive) failure. Months of failed fixes plagued the project until Crescent Electric's Gary Tudor came to the rescue over the Thanksgiving holiday.

Tyson Foods and Crescent Electric Illuminate Senator Ernst

Tyson Foods and Crescent Electric Illuminate Senator Ernst

The Waterloo Crescent Electric team has worked closely with the Waterloo Tyson Fresh Meats Facility since 2012 to consistently evolve their facility with a series of improvements. Here's a flashback to May 13th 2016, when Senator Joni Ernst visited the Waterloo Tyson Fresh Meats Facility and walked through the plant with Crescent Electric employees.

A Behind-the-Sign Look at GE Lighting's Solution for Cheyenne's VA Medical Center

A Behind-the-Sign Look at GE Lighting's Solution for Cheyenne's VA Medical Center

After two years of one problem after another, Cheyenne, Wyoming's VA Medical Center sign needed an update. Crescent Electric worked with their local GE representative to present a brand-new solution: new GE Lighting Linefit LEDs that can revive any T12HO fluorescent sign.